HTM-OPF retaining support plate

Price on request
Order
Ask a question

The fixing base plate is designed for quick installation of the HTM-PB press block. 

Installation sequence of HTM-OPF: 

  • All rows of transit modules are closed with standard HTM-OP base plates
  • Before the last row of modules a fixing base plate is installed, and after it - a standard plate for the press block 
  • Pre-sealing of the section is performed with the HTM-PU clamping device, then fix the position of all components with bolts on the HTM-OPF
  • Next is the installation of the press block, which freely enters into the area prepared for it
  • Unscrew HTM-OPF bolts alternately to distribute the compacted components evenly over the height of the section.
  • Complete the sealing by tightening the bolts of the press block one after the other.